
McDonnell & MillerInstallation & Maintenance Instructions MM-625FLOWSeries FS-250General PurposeLiquid Flow SwitchOPERATIONThis control is an
2NOTE: DO NOT USE LIQUID FLOW SWITCHES ON SYSTEMS WITHFLOW VELOCITY GREATER THAN 10 FEET (3M) PER SECOND.Maximum Liquid Pressure: 160 psi (11.3 kg/cm2
3DFLUID FLOWD= PIPE DIAMETER1" PIPECONNECTION5 x DMINIMUM5 x DMINIMUMa. The flow switch must be installed in the pipe using a threaded tee connec
4BFLOWa. Cover Removal and Installation ProcedureFS251• Using a flathead screwdriver, loosen but do notremove the two cover screws and remove thecover
5b. Electrical Conduit Connection• Connect electric conduit to flow switch electrical enclosure.• Follow accepted electrical practices when installing
ITT8200 N. Austin Ave.Morton Grove, IL 60053tel: 847-966-3700fax: 847-966-9052www.mcdonnellmiller.comMcDonnell & Miller©2007 ITT Corporation Prin
Komentarze do niniejszej Instrukcji